Monha Public Housing (Phase 2) and Monha Games Building (Basement Structure Works)

Monha Public Housing (Phase 2) and Monha Games Building (Basement Structure Works)

Monha Public Housing (Phase 2) and Monha Games Building (Basement Structure Works) The project site is about 130 meters long and 90 meters wide, consisting 3 levels of basement carpark. Piling foundation varies from 1.5 to 3 meters diameter concrete bore piles. A 5-storey podium includes various facilities such as public bus interchange, community facilities and multi-layered green park. There are two residential building each of 31-storey sitting on the podium.